首页 体育内容详情
Fukushima debris removal delayed by another year

Fukushima debris removal delayed by another year

分类:体育

网址:

SEO查询: 爱站网 站长工具

点击直达

新2正网代理开户www.hg108.vip)是一个开放皇冠正网即时比分、新2正网代理开户的平台。新2正网代理开户平台(www.hg108.vip)提供最新皇冠登录,皇冠APP下载包含新皇冠体育代理、会员APP,提供皇冠正网代理开户、皇冠正网会员开户业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

欧博allbet网址www.allbet8.vip是欧博集团的官方网站。欧博官网开放Allbet注册、Allbe代理、Allbet电脑客户端、Allbet手机版下载等业务。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。
 当前暂无评论,快来抢沙发吧~

发布评论